I worked with The challenge in designing the logo for this medical clinical test analysis consultancy was the name “Critical Path Imaging”. I had to make sure it did not look like an MRI or radiology center. So the logo is designed to represent the graphic charts seen in test results of molecular compounds.

This particular project included designing a logo usage guide to instruct employees on the correct methods of using the logo and creating new stationery items.